Description:
System MELTAWAY not connect to other heating systems directly, without the heat exchanger.
Store MELTAWAY PEX tubing should be, having covered them with canvas, as in the open air and indoors. Do not remove the black packaging. Otherwise, long-term storage tube under the influence of sunlight will damage the material. tubing can be covered with asphalt at max. 120 ° C, provided that in the process of laying asphalt on the tubing under pressure and it runs cold water. tubing can be covered with asphalt, sand and slabs, gravel, or may be filled with concrete. To heat the surface of the tubing should be laid at a depth of approximately 100 mm from the surface of the finished floor and with a step of 250 mm in order to ensure uniformity of heating. Indicate on the site where will be bending tubing, before laying tubing.
After the tubing laying MELTAWAY should be built upon by the holders of which must be removed when filling / backfilling PEX tubing.
Fill the tube and oppression system before you start work on the casting (the internal pressure of 0,2 MPa). Join spot welding feed tube and collector. MELTAWAY PEX tubing are used for floor heating systems in large facilities such as hangars, manufacturing and warehouse space. The feed tubing and a collector for such systems are made of plastic, copper or stainless steel. MELTAWAY Systems have been installed at several football fields across Europe. The feed and collector tubing, including connectors, are made of high density polyethylene (HDPE), ie All system components are made of one material with the same coefficient of linear expansion.
MELTAWAY system requires no maintenance. It should only run in the autumn when cold weather and off spring.
Systems MELTAWAY working successfully in many Scandinavian countries, Britain, Germany, Switzerland, Italy and Canada. To establish and successfully operate the heating system at the Mets Stadium field in New York and in seven stadiums in different cities of USA, on Giant street in Chicago
